City gas piping · removal · meter relocation 010-8762-7173 한국어

Home › Restaurants & shops

Gas work for restaurants · shops

For openings, changes of business and kitchen expansions, we size the piping to the capacity of your commercial burners.

  • PipingUsually one day
  • ScheduleTimed to your opening
  • Supplier paperworkWe handle it
  • While you're openOn days off or breaks
Commercial 3-burner gas range installed in a restaurant kitchen, ignition checked
Commercial 3-burner gas range installed in a restaurant kitchen, ignition checked
Additional commercial grill burner installed in a restaurant kitchen
Additional commercial grill burner installed in a restaurant kitchen
New city gas piping in a shop kitchen (before finishing)
New city gas piping in a shop kitchen (before finishing)

When

Call us when

  • You're opening a new shop and need gas connected for the first time
  • A change of business changes the type and capacity of your burners
  • You're expanding the kitchen or adding burners or a charcoal pre-grill
  • Interior work means moving pipes or relocating the meter
  • You're installing commercial gas ranges, fryers or other appliances
  • You smell gas or worry about old piping
  • You're closing a shop and need the pipes and meter removed
  • A gas company inspection flagged something that needs fixing

How it works

We plan backward from your opening day

Restaurant jobs are more often delayed by the supplier's inspection schedule than by the work itself. Tell us your opening day and we'll plan backward from it.

  1. Site check

    We check the appliance plan, pipe route, existing meter capacity and type of facility.

  2. Estimate · schedule

    We set the work and inspection dates around your opening day.

  3. Supply application · installation

    We register the supply application and appliance details and install the piping.

  4. Safety inspection · gas on

    Once the supplier's safety inspection is done, you can use gas right away.

FAQ

What restaurant owners ask most

Our opening is soon. How long will it take?
The piping itself is usually done within a day. But the gas company's pre-supply safety inspection is scheduled separately, so if your opening date is set, it's safest to call at least 1–2 weeks ahead.
We're changing business type. Can we keep the existing piping?
If the type and total capacity of the burners change, the pipe capacity may not fit. A change report to the supplier is also required. We'll check the existing pipe diameter and your burner plan on site and advise you.
Do we have to install a gas leak detector?
Commercial kitchens often require one. It depends on the type and location of the appliances, so we'll advise after checking the site.
Can you work while we're open?
Yes. We often work during break time or on days off. But some sections need the gas shut off, so there will be times you can't cook — please discuss the schedule with us ahead of time.
I was told we're a 'specified gas-use facility'. What does that mean?
Facilities with high expected monthly use, or with piping buried in floors or walls, are classified as specified gas-use facilities, which have different contractor qualification requirements. We determine which applies at the site check and tell you first, and if the job is outside what we're permitted to do, we'll say so honestly.

If your opening date is set, call us now

Delays caused by the supplier's inspection schedule push back your opening. Just tell us your schedule and we'll tell you what needs doing by when.

010-8762-7173

We take calls 24 hours · call anytime, weekends and holidays included

View on Naver MapJob stories on our blog

Free on-site estimate24 hours · weekends & holidays

010-8762-7173